dotuf.blogg.se

Restoration simulation contingency planning pss sincal
Restoration simulation contingency planning pss sincal








Through its modular design, PSS®SINCAL is highly flexible and customizable. Independently or simultaneously analyze the impacts of low, medium, and high-voltage networks PSS®SINCAL – simulation software for analysis and planning of electric and pipe networks is used in over 90 countries by by transmission and distribution planning engineers, protection engineers, consultants, power plant and industrial network operators, operations planning engineers, IT professionals, researchers, and more. With the modular platform of PSS®SINCAL, power system planning and operation engineers are supported with their entire workflow from the initial data import and network modeling (considering past, current and future conditions), to basic and extended calculations, all the way to extensive protection simulations and analysis as well as other methods in time and frequency domains.

restoration simulation contingency planning pss sincal restoration simulation contingency planning pss sincal

PSS®SINCAL supports your entire engineering workflowįor over 20 years, PSS®SINCAL has enabled engineers to tackle different challenges of the changing distribution, transmission, and industrial power systems, including maintaining high reliability of supply and efficiently integrating Distributed Energy Resources. Tackle the complex field of protection with powerful simulations and visualizations, from protection coordination, validation, and calculation of settings, all the way to automated system-wide protection studies. The Fuse Dimensioning module (DN) in PSS®SINCAL checks the dimensioning of fuses in meshed and radial low-voltage networks.Ĭhecking the correct dimensioning of fuses regarding: The goal is the automated simulative verification of all these criteria, which leads to a considerable reduction of the workload. Some of these criteria can be tested without simulation, while others, such as the k-factor test, require extensive simulation.

restoration simulation contingency planning pss sincal

When dimensioning fuses in low-voltage networks, the load current, short-circuit current, conductor cross-section, thermal destruction etc.










Restoration simulation contingency planning pss sincal